How Much Does Bricklaying Cost in Melbourne in 2025?

A glimpse into the world of gourmet dining.

Planning a construction project in Melbourne and curious about the costs involved in bricklaying? Then, you are on the right blog. 

Whether you're building a new home, adding a garden wall, or undertaking a commercial construction project, understanding the bricklaying cost in Melbourne is crucial for budgeting and ensuring your project runs smoothly.

In 2025, prices can vary based on several factors such as the complexity of the project, the type of materials used, and the experience of the bricklayer. With so many variables at play, it’s essential to get a clear idea of what the typical costs are and how to manage them effectively. 

Knowing what to expect allows you to make informed decisions and avoid unexpected expenses down the line. So, let’s break down the details of bricklaying costs in Melbourne and explore the factors that influence pricing, helping you plan accordingly and stay within your budget.

Understanding the Importance of Bricklayers in Building Projects

Bricklayers are an extremely important factor in any construction of a building, whether it is a commercial building or a residential house. That is why their contribution is so important: Their contribution is the foundation upon which the entire building stands, providing stability, security, and strength.

If they were not there, the best-laid plans would be for nothing, ranging from structural flaws to structural failure to later maintenance at exorbitant expense.

  • Crucial Activities: Bricks, blocks, and other building material are laid down by builders in order to make walls, foundations, chimneys, and other things. It involves mixing the ideal ratio of mortar, finding the ideal material, and setting every brick ideally in order to form a powerful and sturdy edifice. 

The placement of each brick should be done carefully, as it helps make the building powerful.

  • Impact on Structural Strength: What they do is to ensure that the structure remains safe and strong so that it can last for a long period. Bricklayers apply their knowledge to ensure that every brick is placed in the correct design and that mortar is made to the optimal consistency. Incompetence can leave weaknesses in the structure, which might lead to expensive repairs down the line.

  • Accuracy and Alignment: Bricklayers ensure that all is level, firm, and correctly aligned, which matters most to the stability of the building in the long run. They ensure with utmost accuracy that there are no slanted walls, openings, or structural defects that would undermine the building. 

They also take into account any movement or settling that might impact the alignment in the long run.

  • Endurance and Aesthetic Value: Their attention to detail when dealing with such materials as mortar and the positioning of bricks makes the building not just structurally stable but also esthetically pleasing. 

Master bricklayers understand how to choose bricks that not only enhance the overall appearance of the building but also add to the appearance and longevity of the building. The cleanliness of the work also enhances the curb appeal of the building.

  • Smooth Construction Process: Without skilled bricklayers, construction projects would be held up and plagued with structural issues. Their expertise ensures the project keeps running smoothly. 

Bricklayers work to tight timelines, finishing on schedule, and avoiding unnecessary holdups and interruptions. They also coordinate with other tradespeople, ensuring smooth coordination throughout the project.

You need to factor in the value of experienced bricklayers in planning for your project. They have a set of skills beyond mere bricklaying; they help ensure your build is structurally and aesthetically sound to endure longer.

Average Bricklaying Costs in Melbourne in 2025

When it comes to hiring a bricklayer, the cost of bricklayers in Melbourne can vary widely based on several factors. Here’s a breakdown of the average bricklaying cost in Melbourne in 2025:

Project Type

Cost per Square Meter

Total Estimated Costs

Standard Bricklaying (Residential)

$60 - $85

$1,500 - $4,000 (for small jobs)

Retaining Walls

$70 - $95

$2,000 - $5,000

Brick Fences or Walls

$65 - $90

$2,500 - $7,000

Commercial Bricklaying

$80 - $120

$5,000 - $20,000 (or more depending on scale)

Foundation Bricklaying

$75 - $110

$3,000 - $10,000

The total cost of fencing will depend on factors such as the complexity of the job, the materials used, and the region within Melbourne.

Factors Influencing Bricklaying Costs

Several key factors can influence the cost to hire bricklayers in Melbourne. Understanding these factors will help you estimate costs more accurately for your specific project. Here’s a look at the main variables that affect pricing:

1. Type of Project:

Whether you're building a small garden wall or a large commercial structure, the size and scope of the project significantly affect the overall cost. Larger projects require more materials, labor, and time to complete, which raises the cost compared to smaller, simpler jobs. 

Additionally, commercial projects may involve higher safety standards and stricter regulations, which can add to the cost. Smaller projects are typically more straightforward and require fewer resources, making them more cost-effective.

Factor

Impact on Cost

Estimated Cost

Type of Project

Small job: lower cost
Large job: higher cost

Small job: $1,000–$3,000; Large job: $5,000–$20,000+

Project Size

Larger projects need more resources and time

Medium job (e.g., 100-300m²): $5,000–$15,000

Commercial vs Residential

Commercial projects may have higher regulations and complexity

Commercial: $10,000–$50,000+

Site Specifics

Difficult terrains and challenging layouts increase costs

Sloped terrain or tight space: +$500–$2,000

 

2. Material Choice:

Premium bricks or custom-made bricks can significantly increase the cost compared to standard bricks. Higher-quality materials often come with a higher price tag, both in terms of the bricks themselves and the associated labor costs for handling and laying them. 

Specialized bricks or stones, for example, require more precise work and longer installation times, pushing bricklaying costs in Melbourne higher. Choosing unique or imported materials can also raise the cost due to limited availability or specialized handling.

Factor

Impact on Cost

Estimated Cost

Material Choice

High-quality materials increase cost significantly

Standard bricks: $60–$85/m²; Premium bricks: $95–$150/m²

Brick Type

Natural stone and custom bricks cost more

Natural stone: $100–$250/m²; Custom bricks: $120–$200/m²

Sourcing Materials

Imported materials add extra transport costs

Imported materials: $5,000–$15,000 depending on quantity

Durability Requirements

Bricks with longer life spans increase costs

High-durability bricks: $110–$150/m²

 

3. Labor Costs:

The expertise and experience of the bricklayer can significantly affect labor costs. Skilled and experienced bricklayers charge higher rates, but their work is often faster and of higher quality. 

Hiring an experienced tradesperson may increase the upfront cost but can save you money in the long term by avoiding costly mistakes or rework. Specialized tasks like decorative masonry or brick restoration may also demand a premium labor rate.

Factor

Impact on Cost

Estimated Cost

Labor Costs

Experienced bricklayers charge more

$60–$120/hour (depending on skill level)

Skill Level

More experienced workers charge higher rates

Highly skilled: $100–$150/hour

Complex Work

Intricate designs or detailed brickwork cost more

Decorative brickwork: $120–$180/hour

Hourly Rates

Rates vary based on location and complexity

Standard work: $60–$80/hour; Complex designs: $90–$120/hour

 

4. Site Accessibility:

If the site is difficult to access or requires additional equipment for material transport, costs may rise. Tight spaces, steep slopes, or areas with limited access can delay the project or require specialized machinery (e.g., cranes or scaffolding). 

Additionally, transport bricklaying costs in Melbourne for delivering heavy materials to hard-to-reach locations can further drive up the cost of the job. The distance between the supplier and the job site can also play a role in transport expenses.

Factor

Impact on Cost

Estimated Cost

Site Accessibility

Difficult sites may add extra transport or machinery costs

Additional $500–$2,500 depending on complexity of access

Delivery Difficulties

Hard-to-reach sites raise delivery expenses

Remote site: $1,000–$3,000 extra for delivery

Equipment Needs

Specialized equipment for access or lifting

Crane use: $500–$2,000/day depending on site access

Traffic Considerations

Limited transport routes can cause delays

Traffic impact: $200–$1,500+ based on location

 

5. Complexity of the Job:

Intricate designs or complicated structures (e.g., arches, curves, or multi-story walls) require more time and expertise, which increases labor costs. The more complex the project, the longer it will take to complete, and the more specialized the skills required. 

Such projects can also increase the amount of material waste, further impacting costs. Detailed designs, such as decorative or artistic brickwork, also add to the cost due to their precision.

Factor

Impact on Cost

Estimated Cost

Project Complexity

Intricate work increases labor time and costs

Simple walls: $60–$85/m²; Complex designs: $90–$150/m²

Specialized Structures

Arches, curves, and non-standard designs increase difficulty

Arched designs: $100–$200/m²

Detailed Finishes

Detailed finishes or patterns add to the time required

Decorative masonry: $150–$250/m²

Time and Waste

More intricate work leads to higher material waste

Waste from complex work: $500–$1,500 extra

 

6. Project Duration:

Longer projects will naturally incur higher labor and overhead costs. The more time required to complete the job, the more you will pay for both labor and any additional equipment or tools needed. 

Extended project durations also mean increased costs for utilities, site management, and other overheads. Extended project timelines can also affect the coordination with other trades, further driving up costs.

Factor

Impact on Cost

Estimated Cost

Project Duration

Extended projects increase overall cost

$1,000–$5,000 depending on length and complexity

Long-term Projects

Long-lasting projects require more resources

Projects longer than 3 months: $5,000+

Scheduling Conflicts

Overlapping trades can extend the duration

Coordination cost: $1,000–$3,000

On-site Management

Prolonged project duration increases management costs

Site management: $500–$2,000/week

 

7. Weather Conditions:

Adverse weather conditions can delay work or require additional protection for materials, adding to the overall cost. Rain, extreme heat, or cold temperatures can slow down progress, and in some cases, cause material issues (e.g., mortar setting too quickly). 

Weather delays may also require rescheduling and added bricklaying costs in Melbourne for covering materials or providing temporary shelter for workers. Severe weather can also cause unexpected damages, adding to repair costs.

Factor

Impact on Cost

Estimated Cost

Weather Conditions

Adverse weather increases project duration and cost

$500–$2,000 depending on severity of delays

Rain Delays

Wet conditions require drying time or alternative methods

Rain delays: $500–$1,500 per day

Extreme Temperatures

High heat or cold delays work and increases risks

Heatwave delays: $1,000–$3,000

Weather-Related Damages

Materials damaged by adverse weather require replacement

Weather-related damages: $500–$2,000+

 

By understanding these factors and how they influence the cost to hire bricklayers, you can better plan your project budget. Each factor impacts not just the price, but the quality and timing of your bricklaying work. 

Keep these points in mind to avoid unexpected costs and ensure your project stays on track.

Tips for Reducing Bricklaying Costs

If you're looking to reduce the cost to hire bricklayers without compromising on quality, here are some tips that can help:

  • Plan Ahead: Clear and detailed project plans can reduce the risk of delays and additional costs.

  • Source Materials Wisely: Opt for standard bricks or bulk-buy materials to reduce costs.

  • Get Multiple Quotes: Compare quotes from different tradies to find carpenters the best price.

  • Consider Off-Peak Times: Scheduling your bricklaying work during off-peak seasons can help lower labor costs.

  • Be Efficient with Design: Simple designs and fewer custom features will reduce labor time and material costs.

  • Hire Experienced Bricklayers: Skilled bricklayers may charge a bit more upfront but can complete the job faster and more efficiently, saving you money in the long run.

By following these tips, you can minimize the overall bricklaying cost in Melbourne while still ensuring quality craftsmanship. With the right planning, material choices, and hiring practices, you can manage costs effectively without sacrificing the durability and aesthetic of your project.

What to Look For While Hiring a Bricklayer

When hiring a bricklayer, it’s essential to focus on several key factors to ensure you get the best value for your investment. Selecting the right professional can make all the difference in the quality and cost of your project. 

With Trusted Tradie Network, you can easily find experienced and reliable bricklayers who will meet your needs and exceed your expectations.

Here are some crucial considerations to keep in mind:

  • Experience and Qualifications: Look for a bricklayer with a proven track record and the right certifications for the job. A skilled bricklayer should have a deep understanding of the trade and the specific requirements of your project, whether it’s residential or commercial.

  • Insurance and Licenses: Ensure the bricklayer is fully insured and holds the necessary licenses to perform the work in Melbourne. Insurance protects you and your property in case of accidents or damage during the project.

  • Reputation: Checking the reputation of a bricklayer is one of the most important steps in your hiring process. Research online reviews, ask for references, and review their past work to assess the quality of their service.

  • Transparent Pricing: Choose a bricklayer who provides clear and detailed quotes, outlining the costs of labor, materials, and any additional charges. This helps avoid any unexpected costs or surprises down the line. 

A good bricklayer will be upfront about all potential expenses and will provide a detailed breakdown of their pricing to ensure you’re comfortable with the terms.

  • Communication and Professionalism: Effective communication is key throughout the project. Make sure the bricklayer is approachable, responsive, and willing to discuss your project in detail.

    A professional bricklayer will be punctual, organized, and willing to offer suggestions or advice to improve your project’s outcome.

Taking these factors into account will help you make an informed decision when hiring a bricklayer. Platforms like Trusted Tradie Network make the process easier by connecting you with highly skilled professionals, ensuring that your project is completed on time, within budget, and to the highest standard.

Final Wrap-Up

Understanding the bricklaying cost in 2025 is key to staying within your budget while ensuring your project is completed to a high standard. Costs will vary based on the size, complexity, materials, and the bricklayer’s experience, but with careful planning and a bit of research, you can find ways to reduce costs. 

Always get multiple quotes, and remember that hiring experienced and reliable bricklayers can save you time and money in the long run. By considering all the factors and making informed decisions, you can ensure your bricklaying project in Melbourne stays on track both financially and professionally. 

FAQs.

  1. How much does a brick cost in Australia? 

The cost of a standard brick in Australia typically ranges from $0.50 to $1.50 each, depending on the type and quality. Premium or custom bricks can cost more, ranging from $2 to $3 or higher.

  1. Can a Bricklayer lay 1000 bricks in a day? 

Yes, a skilled bricklayer can lay around 800 to 1,000 bricks in a full workday, depending on the complexity of the job, site conditions, and the type of bricks used. However, this can vary based on the project's requirements.

  1. How much should I pay a bricklayer per day? 

The cost of hiring a bricklayer per day can range from $300 to $800, depending on their experience, the type of work, and the location. More complex jobs may cost more due to additional labor and skill requirements.

  1. How much does a bricklayer charge per m²? 

Bricklaying services typically charge between $60 and $150 per square meter, depending on the type of bricks, the complexity of the design, and the location of the project. More intricate work, such as decorative brickwork, may cost more.